IT checklist for opening a new leasing office

This IT checklist for opening a new leasing office is for property managers and project owners working toward an opening date. Use it to line up internet, Wi-Fi, devices, accounts, printing, and phones, and to test them before the first appointment or tour.

Leasing office staff working together at a reception desk

Confirm the site and service schedule

Start with the opening date, building access, vendor lead times, and the person who can make or approve technology decisions for the location.

  • Confirm the opening date, move-in sequence, address, suite details, and building access rules.
  • Order internet and phone service early enough for the provider's lead time and installation.
  • Name the project owner and list the internet, phone, security, landlord, and hardware contacts.
  • Record what the landlord or building supplies and what your company must buy or set up.

Prepare the employee workspace

Test the office with the devices and tasks employees will actually use. A provider handoff is not the same as a working leasing desk.

  • Prepare workstations, monitors, docks, chargers, printers, scanners, phones, and accessories.
  • Set up employee accounts, email, shared mailboxes, calendars, files, sign-in security, and property application access.
  • Set up business Wi-Fi and any separate guest or resident network the building requires.
  • Test printing, scanning, calls, video meetings, shared files, sign-in, and leasing tasks from each desk.

Document the day-one handoff

A short handoff record keeps the office supportable after opening and shows what is still unfinished.

  • Save provider tickets, circuit details, equipment inventory, warranties, account owners, and vendor contacts.
  • Record Wi-Fi, printer, phone, device, and application details in the approved documentation location.
  • List each open issue, workaround, and dependency with an owner and a follow-up date.
  • Schedule a review once the team has worked in the office under normal conditions.

Leasing-office opening worksheet

Use this worksheet at a walkthrough before the first tour or appointment. Assign an owner and date to each row, record whether the test passed, and document who will resolve any issue that could delay opening.

Day-one checks for a leasing office
RequirementSuggested owner and timingAcceptance test
Internet and staff Wi-FiNetwork lead after ISP installationConnect a staff device in the office and open the services staff need. Record the circuit reference and support contact.
Staff accounts and MFAIT and the leasing manager before first useHave an approved staff member sign in from a leasing workstation and complete multifactor authentication.
Shared mail and filesMicrosoft 365 or Google Workspace administrator before handoffOpen the shared mailbox and the team's files with the permissions required for a normal shift.
Leasing softwareLeasing manager with the software owner before go-liveComplete a representative leasing workflow using an approved test record. Confirm any permissions or vendor escalations.
Printers and scannersSite contact after devices join the networkPrint from each required desk and scan to the approved destination. Confirm a test page does not expose resident information.
Phones and voicemailPhone owner after the provider confirms activationPlace and receive a test call using the public leasing number. Check voicemail routing and who receives alerts.
Vendor and support handoffProject owner before openingConfirm staff can open a support request. Record vendor contacts, open issues, named owners, and follow-up dates.
  • Test from the actual office with approved staff accounts and test data.
  • Use the notes column for ticket references and outcomes. Store credentials through your approved process.

Download the leasing-office worksheet (CSV)

Questions to ask

How far ahead should IT planning start for a new leasing office?+

Start as soon as the opening date and site are known. Internet installation, building access, hardware delivery, and vendor scheduling can set the timeline.

What must work before the office opens?+

At minimum, internet, Wi-Fi, user sign-in, email, shared files, printing, phones, and required applications must work. Test them, and the actual leasing tasks, before opening.

Can the office open before every improvement is complete?+

Sometimes. Separate day-one requirements from later improvements, write down the remaining risk, and give each deferred item an owner and a date.

Need help applying this guide?

Start with your team, locations, systems, and deadline. A person replies within one business day.

Call(206) 413-7811Emailhelp@arctechone.com
First replyWithin one business day

ArcTechOne AI assistant

Let’s talk IT.

I can help you explore our services, choose IT equipment, or plan a project. What are you working on?

Enter sends. Shift + Enter adds a line.
0/400